Preparing for a Commercial AC Inspection: A Facility Checklist
A two-hour inspection produces a proposal you can rely on only if the site is ready. Six things to prepare, and the information that turns a guess into a quote.
An AC inspection is a survey: someone walks the site, counts and identifies every unit, notes access, tests what can be tested, and writes a scope. If the site is disorganised, the survey gets truncated and the proposal gets padded with assumptions. Preparing properly takes an hour and saves weeks of negotiation later.
1. An accurate unit count before the visit
Walk the building yourself and list every unit — indoor and outdoor — with location. Include the ones nobody thinks about: the pantry, the server room, the security cabin, the equipment room, and any unit switched off for years.
For each, note the make, the tonnage on the sticker, and roughly how old it is. If a sticker is unreadable, photograph it and let the surveyor identify the model.
The most common surprise in a commercial survey is that the actual count differs from the count in the manager's head by 20–30 percent. That discrepancy alone changes the proposal, so establishing it beforehand makes the numbers comparable between providers.
2. Access arrangements, in writing
Access decides how long the inspection takes and what equipment is needed.
- Who holds keys, and who can open the terrace, shafts and plant rooms?
- Are there restricted areas — server rooms, labs, clean zones — that need an escort?
- For high outdoor units, is there a safe access route, or does the surveyor need rope access or a ladder?
- Are false ceilings fixed or removable? Cassette units need panel access for inspection.
Confirm this a day in advance in a message. A survey that stalls at a locked door produces estimates, not measurements, and you will be the one who pays for the difference.
3. Power, water and operating hours
The surveyor needs to run units to assess them properly. Confirm which circuits are live, whether the isolators are accessible, and where water is available for a test if needed.
Also state operating hours and any windows when the building is empty. A survey during business hours in a clinic is disruptive; a survey after hours needs someone on site. Deciding this in advance avoids a second visit.
If there are known electrical issues — a circuit that trips, a stabiliser that buzzes, a phase imbalance — mention them. They affect both the scope and the safety of the inspection.
4. Service history, even if it is thin
Bring whatever records exist: past invoices, service sheets, warranty cards, the previous AMC. If there is nothing, say so — that is itself information, because units with no history usually need a deeper first visit.
Flag anything known to be faulty: the cassette that drips in July, the split that never cooled properly after installation, the outdoor unit that makes noise. A good proposal prices the remediation separately and honestly rather than burying it in the annual fee.
Also list any units under manufacturer warranty with dates. Those should not be included in parts cover, and the contract should say so.
5. What the surveyor should give you on the day
A credible inspection produces notes on the spot, not just a quotation a week later. Expect:
- A per-unit list with type, tonnage and condition rating.
- Photographs of problem areas — corroded coils, damaged insulation, blocked drains.
- An indication of any unit that needs repair before a contract makes sense.
- A clear statement of what the proposal will and will not include.
If nobody opens a single unit or looks at a condenser during the visit, the proposal is a price list, not an assessment. That is worth knowing before you compare numbers.
6. Comparing proposals fairly
Three proposals for the same building are rarely comparable as totals. Normalise them before deciding:
| Compare | Why it matters |
|---|---|
| Visits per unit per year | Two visits versus four changes the price legitimately |
| Cleaning level per visit | Filter cleaning is not coil cleaning |
| Parts boundary | Preventive versus comprehensive is a different product |
| Response time | A four-hour response costs more than next-day |
| Exclusions | Missing exclusions usually mean surprise invoices |
Ask each provider to quote the same visit count and the same parts boundary, then compare. Otherwise you are choosing between different products and calling it a price comparison.
Key takeaways
- Count and photograph every unit before the surveyor arrives.
- Confirm keys, escorted areas and terrace access in writing.
- State operating hours so the inspection does not disrupt work.
- Give whatever service history exists — gaps matter too.
- Normalise visit counts and parts boundaries before comparing prices.
Frequently asked questions
How long does a commercial AC inspection take?
For 8–15 units, roughly two hours including unit opening and condenser checks. Larger or multi-floor sites can take most of a day.
Does an inspection cost anything?
For a genuine AMC enquiry, most providers inspect at no charge. Standalone condition audits are usually chargeable.
What if some units are not working at inspection?
They should be listed as faulty and quoted for repair separately. Including a dead unit in an AMC without noting it creates a dispute later.
Transparent pricing
Featured AC services and rates
Published rates straight from the AK Aircon Services rate card — 13 categories covering service, installation, gas charging, repair, parts and material.
| Service | Split AC | Window AC |
|---|---|---|
| Dry / Lite service | ₹399 | ₹399 |
| Standard jet service | ₹549 | ₹549 |
| Foam jet service | ₹649 | ₹649 |
| Deep dismantle service | ₹1,349 | — |
| Inspection / diagnosis visit | ₹299 | — |
| Gas charging | ₹2,499 | — |
| Leakage repair | ₹1,499 | — |
| Standard installation | ₹1,499 | ₹1,499 |
| Uninstallation | ₹899 | ₹899 |
| Indoor unit shifting | ₹1,299 | — |
| PCB / electrical repair | ₹1,799 | — |
| Compressor replacement | ₹6,499 | — |
| Copper pipe (per metre) | ₹550 | ₹550 |
Prices include labour and material unless a note states otherwise. Installation material is extra. Units above 2.2 tons are quoted individually.
Need a specific price?
Tell us the unit type and the service. We confirm the exact charge before work starts.
See all 13 categoriesRates are transcribed from the AK Aircon Services rate card. Charges for unusual site conditions or non-standard equipment are confirmed before work begins.